Projects
Our Boiler Replacement Projects
Mt. Valley High School
Mt. Valley High SchoolOur second boiler room upgrade at this facility.
The first of which we did was in 2002.
We removed two Kewanee fire tube boilers and replaced them with Cleaver Brooks Boilers. At that time, we reduced the oil consumption by 25,000 gallons per year.
In 2021 we upgraded the boiler room from the Cleaver Brooks boilers we installed 20 years prior in 2002. With the condensing boiler technology 21 years later, we further reduced fuel consumption by 8,000 gallons less fuel than the 20-year average. This was achieved in conjunction with a new energy management system that monitors CO2 or Carbon Dioxide levels by providing demand ventilation in all classrooms and major air handlers including the gym air handlers which we also replaced.
The boiler technology combined with a new building automation system has brought the school built in 1968 to a very efficient operating facility given its age.
Noble High School
Noble High SchoolWhen Noble High was built the contractors installed two Bryant flex tube boilers. The boilers were marginal at best and worked hard to maintain the facility. We upgraded the heating plant to three Viessmann Boilers.
Monmouth Academy
Monmouth AcademyThe Academy had two H.B. Smith 28 series boilers that we replaced with 2 Viessman CM2 high efficiency gas boilers. Significant reduction in fuel and we installed a new Building automation system interfaced with the boilers.
Marshwood High School
Marshwood High SchoolMarshwood High was the last boiler room upgrade in the district as Specialty Services has replaced and upgraded the boiler rooms in all schools.
This last upgrade was done in two phases and was part of an ongoing multi year plan.
Leeds Central School
Leeds Central SchoolSpecialty Services was a subcontractor choosen to install boilers at Leeds Central School.
We removed old boilers from the basement and rigged new boilers down the stairs and utilized an old storage room for the new boiler room.
Our Air Conditioning Projects
Mardens
MardensSpecialty Services upgraded/replaced the existing roof top and installed a new 50 ton Carrier unit. We also removed older unitary heaters and installed new duct work for better air distribution.
Ocean State
Ocean StateThis large air condition project required removing one large rooftop that supplied A/C and heat for a supermarket that was retrofitted to Ocean State's retail space.
The retrofit included removal of the one large unit and installing over a dozen rooftops and heat pumps to provide heating and cooling to the new retail store.
Cascade Brook School
Cascade Brook SchoolSpecialty Services, an E-Maine qualfied partner, worked with Efficiency Maine to secure over $350,000+ in rebate towards an installation of a new VRF (Variable Refrigerent Flow) system at Cascade Brook School
Canuvo
CanuvoCanuvo Is one of the first of eight Medical Marijuana dispensaries approved by the State of Maine. This is considered high tech indoor agriculture.
This process allows Cannabis to be grown in all seasons, controlling temperature, humidity, to properly grow in all seasons regardless or outside conditions.
Our Refrigeration Projects
Central Distributors
Central DistributorsSpecialty Services installed a large walk-in cooler for Central distributors for their Brewer location, and upgraded Centrals Lewiston Distribution Center to ensure their product is kept at optimum temperature to deliver to their customers.